0
我有一个项目,其中有一个主包和几个子包,我在主服务器中调用。 然而,当我启动主包裹它进入错误的一个“执行包任务” 见下面从输出窗口的输出中:SSIS:执行执行包任务时出错
Information: 0x40016042 at build_NAV_sources: The package is attempting to configure from the parent variable "var_actual_timestamp".
.
.--more variables configuration
.
Information: 0x40016042 at build_NAV_sources: The package is attempting to configure from the parent variable "var_table_prefix".
Error: 0xC00220E0 at Execute Package Read Dim norriq data to sources: The connection is not specified.
Error: 0xC0024107 at Execute Package Read Dim norriq data to sources: There were errors during task validation.
Error: 0xC00220E4 at Execute Package build nav sources: Error 0xC0012050 while preparing to load the package. Package failed validation from the ExecutePackage task. The package cannot run.
.
Task failed: Execute Package build nav sources
SSIS package "F:\Workspaces\KPA\TFS\Norriq\BI\SQL 2012\NAV 2015\SSIS\NAV Datamart\build_NAV_datamart_master.dtsx" finished: Success.
当我检查包凡表示该连接没有指定我清楚地看到有一个指定的连接。在我的连接管理器中,我看到了连接,并且在编辑这个连接时检查连接是否正常工作。
为了让离奇:当我启动包(build_NAV_sources)seperatly,它的执行没有任何错误或警告
任何人对发生了什么线索?
THX
没有改变任何重要的东西,我已经在TFS中检查了我的解决方案,关闭了VS,再次打开了解决方案并进行了构建/重建,并且它神奇地工作。 – KevinP